Where the money goes when building a battery swap station: a breakdown of batteries, cabinets, site, and operations
When calculating payback from a quotation, the easy mistake is treating "how much one cabinet costs" as "how much one station costs."Based on operating cost accounting, the cost of one battery swap station is roughly divided into four parts: batteries about 45%, cabinet about 20%, site about 15%, and operations and maintenance about 12%, totaling 92%. The cabinet is only one part of it.

How much does each of the four parts account for

Cost item
Approximate share
What is inside it
Battery
45%
Lithium battery pack
Cabinet
20%
Battery swap cabinet itself
Site
15%
Rent and site-related expenses
Operations
12%
Expenses such as routine maintenance and fault handling
These four figures reflect the operator's own experience-based estimates, not industry statistics., and it will vary across different cities and electricity prices, but the proportional relationship largely holds. Beyond these four items there is another roughly 8%, which is recommended to be listed as a separate line when budgeting.

Why the battery accounts for nearly half

The battery is the largest of the four items. It is both an investment and the part that is constantly turning over.
The battery and the cabinet must match on three things:Whether the voltage platform is correct, whether a single cabinet fits, and whether the charger's output range can cover it. If these three points do not match, the battery will not fit when bought and cannot be fully charged, so the money is wasted. The specification Daochong provides isCompatible voltage 48V/60V/72V, single-compartment load capacity 40kg, charger output range 43—88V——Whether the battery in hand can be used, just check it against these three points.
There is one more factor that affects the quantity:Lithium battery capacity drops 30%—50% below 0℃, and charging is basically impossible below -10℃。For the number of usable batteries at northern sites, it is recommended to reserve margin according to this discount.

For this 20% cabinet share, the money mainly goes into four components

Compartment control, charger, sheet metal, fire protection parts. The specific differences of these four items are covered in another article; here you only need to remember one thing:Even if it also says "12 compartments, how many kilowatts", the specifications of these four items can be completely different, and most of the price difference is likely here.

This 15% for the site is not just rent

In the site category, what is easily overlooked is electricity.
The cabinet's power determines how much electricity must be reserved for this location. Cabinets with different numbers of compartments differ greatly in power. For how many units to place at a site, their power must be summed up and checked against the site's power capacity. Ask clearly about power matters before signing the lease——changing after signing usually requires power capacity expansion, which costs more. These 10 Dochion models range from 5 compartments to 12 compartments, and the maximum power of a single cabinet is distributed as follows:
Number of compartments
Maximum power
5-Bay
4kW
8-Bay
6.5kW
10-Bay
8kW
12-Bay
8kW
12-Bay Tap-to-Swap Model
9.6kW
Another easily overlooked aspect of the site is drainage. The cabinet has IP54 protection (dust protection level 5, splash water protection level 4) and is not designed for long-term immersion. Once water enters, this location must be shut down.Ground hardening, drainage, and rain shelters for these renovations should be counted in the site's upfront investment.

How to estimate electricity cost

Electricity cost is called out separately because it is directly tied to power consumption and is easier to calculate clearly than the other items.
Put simply, electricity cost is "how many kWh are charged in × electricity price." How many kWh are charged per day depends on three things: how many cabinets there are, how many battery swaps per day, and how much is charged each time. These three numbers have no universal value; only after operating it yourself will you know.
Efficiency plays a role in this item:Power factorHigh, lower losses on the grid side;Conversion EfficiencyHigh, more of the same amount of electricity gets charged in. These two figures should be written as specific values in the quotation; the more cabinets there are and the fuller they run, the more obvious the difference. Daochong uses PFC potted chargers,PFC Value ≥0.96,Conversion efficiency 90%—92.7%. Potting also serves another purpose: it helps with heat dissipation and dust protection, making the charger more durable in high-temperature and high-humidity environments——What is saved here is the spare parts cost, not on the electricity bill.

Another part of this 12% O&M is downtime

O&M budgets are usually compiled as "labor plus spare parts," and there is another part that is easily overlooked—While the cabinet is offline, battery swaps cannot be completed, and that day's revenue is lost.
Several things can bring this number down:
Method
What to Look For
What is being saved
Stable communication
Can the offline rate be checked in the operations backend?
Revenue loss during downtime
On-site repairable
Whether it is front-maintenance and whether special tools are required
Time for off-site repairs
Service outlet
Whether there is a service outlet in your city
Arrival time and travel cost
How much of these three things can be seen in the quotation and contract makes a big difference. Daochong's approach is: the communication is secondary development on a CAT1 module, using TCP/IP,Offline rate below 0.3%; the site uses a front-maintenance design, allowing quick repair with a single screwdriver; 18 service centers nationwide, with a local office and service team in Northeast China. For warranty, cabinet control, main control,Sheet metal, charger three years, complete machine standard one year, software service lifetime maintenance——which components the warranty covers directly determines whether the operation and maintenance budget after the warranty period will rise.

Put these items into one table

What needs to be calculated
Required variables
Where do the variables come from
Battery investment
Total number of battery packs invested × unit price
Supplier quotation + your own turnover calculation
Cabinet investment
Number of cabinets × quotation per cabinet
Supplier quotation
Site investment
Monthly rent × 12 + one-time renovation
Property management and construction contractor
Power capacity
Sum of maximum power of all cabinets
On-site verification of grid connection conditions
Electricity cost
Total electricity charged per day × electricity price
Your own operational data
Operations
Labor + spare parts + downtime loss
Measured in the first three months
In this table, the last row is the one that requires actual measurement. Downtime loss is only known after running, so the role of the first cabinet is not just to make money, but also to fill in real numbers for this line.

Run one first, then decide how many to deploy

The volume at a location only counts once you have run it yourself. Some manufacturers support ordering from a single unit and opening an independent account for self-operation, while others have minimum order requirements—ask this clearly and you can save a lot of trial and error later. One of Daochong's cooperation options is to take just one device and open an independent agent account for self-operation, positioned asVerified Site; the delivery lead time is25 working days after placing the order, about five weeks, and this time must be factored into capital occupation—from placing the order to the equipment arriving, there is a gap of more than a month.

Final Thoughts

In the accounts of a station, usually only the cabinet is the "visible quotation".Battery, site, and O&M together account for 72%. Budgeting only by cabinet price will miss most of the expenditure.